NFPA 101

Emergency and exit lighting tests, one fixture per row.

The monthly 30-second test and the annual 90-minute test, recorded fixture by fixture: did it stay lit, are the lamps aimed at the exit path, is the sign legible with its arrows the right way.

The form

What your inspectors record.

Emergency and exit lighting test

NFPA 101, 7.9
  • The test performed and how many fixtures are on site
  • Each fixture: location, type and battery date
  • Each fixture's checks: stayed lit for the whole test, lamps lit and aimed, exit sign legible with the right arrows; and the action taken
An emergency lighting test on a phone: one row per fixture, with its battery date and checks

On an inspector’s phone

Why it works in the field

Monthly and annual

Both tests on the same form, with the building's schedule rolling forward to the next one.

Battery dates kept

Each fixture's battery date is on the report, for the next test and the next battery change.

Failures priced

A fixture that fails is a deficiency, and a proposal to replace it is a few taps away.

Every inspection

And what every report in Serdock gets.

On a phone, on site

Forms built for one hand on a ladder: Yes / No / N/A answers, photos and voice notes, and nothing typed twice.

Deficiencies kept

Every "No" becomes a deficiency on the building and the device, with its severity, ready to quote.

Signed, sealed and sent

The inspector signs on screen, the report is sealed against changes, and the PDF reaches the customer the same day.

The next one scheduled

Submit an inspection and the building's next one is set from its interval, with reminders for your office and the customer.

Device tags with a QR code

Print tags for devices and buildings. A scan shows the inspection history and the next due date, on your own website.

In the customer's portal

Property managers see every report and open deficiency for their buildings, and approve repairs online.

Questions

Does Serdock support the 30-second and 90-minute tests?
Yes. The form records which test was performed, and each fixture's result for it.

See it with your own work in mind.

A 30-minute walkthrough, on the inspections and jobs you actually do.